Why Two CNC Quotes for the Same Drawing Differ by 40%
Same drawing, two prices 40% apart — and neither shop is cheating. Five numbers move the price. Compare those five, not the total.

Why Two CNC Quotes for the Same Drawing Differ by 40%
You send one drawing to two machine shops. One quotes $1,000. The other quotes $1,400. Same part, same drawing, same quantity — and a gap big enough to make you suspect one of them is either cutting corners or overcharging. Usually neither is. A CNC quote is not a price for a part. It is a price for a set of assumptions, and the two shops made different ones. The drawing you sent leaves five things open, and each shop filled in the blanks its own way. A 30–40% gap between two quotes for the same drawing is not unusual (typical) — and it almost always comes down to the same five numbers. This article takes the quote apart, number by number, so you can see which shop priced the part you actually need — and which one priced a different part that happens to share your drawing number.
Tolerance: the quietest price driver
The first number is tolerance, and it is usually the biggest one. A bore toleranced to ±0.01 mm needs a slower cut, a more careful setup, more inspection, and a higher scrap risk than the same bore at ±0.05 mm. A drawing with thirty tight dimensions is a different job from a drawing with three, even when the part looks identical. Here is where quotes diverge: one shop reads your drawing's general tolerance and quotes the loose dimensions loosely, reserving the tight work for the features that carry a tight callout. The other shop sees a drawing full of tight numbers and prices every dimension as if it were critical. Both shops are being honest. They are pricing two different jobs. Before you compare prices, check which dimensions on your drawing are actually tight — and whether they need to be. Our standard tolerance is ±0.05 mm, and critical features can reach ±0.01 mm subject to drawing review. If only three features need the tight number, say so. The quote will come down, and the part will be no worse.
Surface finish: a line item, not a footnote
The second number is the finish. "As machined" and a specified finish are two different prices, and two different lead times, because the finish is often a separate process done after machining — sometimes by a different supplier entirely. One shop may have quoted the part as machined, with no finish at all. The other may have included anodizing, plating or bead blasting in its price. The gap between those two quotes is not a pricing difference. It is a scope difference — and it is invisible if you only compare totals. Ask each shop to break out the finish as its own line. Then compare the machining price with the machining price, and the finish price with the finish price. If one shop's finish line is missing, it has not quoted the same part you asked for.
Inspection: what gets measured, and how
The third number is inspection, and it is the one buyers forget to ask about. A part that is measured on every feature, with a written report, costs more than a part that is spot-checked — because measurement takes machine time, operator time, and in some cases equipment the shop has to set up specially for your part. One shop may have included full inspection in its price. The other may have quoted visual inspection only, or none at all. If your part goes into an assembly where a bad bore means a failed product, the cheaper quote is not cheaper — it is uninspected. If the part is a simple bracket, full inspection may be money spent on nothing. Decide what inspection your part actually needs before you compare quotes, and ask both shops to state what is included. "Inspected" without a definition is not a comparable line item.
Material certificates: paper that costs money
The fourth number is the material certificate. A mill certificate that traces your aluminium or stainless steel back to its batch costs the supplier time and paperwork — and sometimes a higher material price, because certified stock is bought and stored separately from general stock. One shop may have quoted certified material with full traceability. The other may have quoted standard commercial stock with no certificate. For a medical or aerospace part, the certificate is not optional, and the cheaper quote is a quote for a part you cannot use. For a prototype bracket, the certificate may be unnecessary cost. This is the number most likely to cause a nasty surprise after the order: a buyer accepts the cheaper quote, then discovers at delivery that the material certificate they need was never included. State on the drawing or in the email whether you need a material certificate, and ask both shops to confirm it in writing.
Quantity: setup time spread across the batch
The fifth number is quantity — not the price per piece, but what the quantity does to the setup. Every CNC job starts with programming, fixturing and first-article checks. That setup time is roughly the same whether you order one piece or one hundred, so on a one-piece order it all lands on one part, and on a hundred-piece order it is spread thin. That is why a quote for 10 pieces can look expensive per piece next to a quote for 100 — and why two shops quoting different quantities are not comparable at all. It is also why a shop that quoted you 10 pieces at a high unit price may actually be the cheaper shop at 100 pieces. Our minimum order is 1 piece, and samples take 3–7 working days while production takes 10–15 working days — but the per-piece price only makes sense at the quantity you actually asked for. When you compare quotes, check the quantity line first. If the two shops quoted different quantities, you are comparing two different jobs.
How to compare two quotes in ten minutes
Ask each shop for the same five lines, in writing:
- Tolerance scope: which dimensions are quoted tight, and which fall under the general tolerance?
- Finish: is the finish included, and as what line item?
- Inspection: what is measured, and is there a written record?
- Material: is a mill certificate included, and for which grade?
- Quantity: what quantity is the unit price based on, and how does it change at other quantities?
The shop that answers all five clearly is usually the shop that understood your part. The shop that will not break the quote down is the one to be careful about — not because it is dishonest, but because you cannot tell what you are buying.
Frequently Asked Questions
Q1: Is the cheaper quote always cutting corners?
A: Not necessarily. It may have quoted looser tolerances, no finish, basic inspection or uncertified material. Compare the five lines above before judging the price.
Q2: Why does tolerance change the price so much?
A: A tight tolerance means slower cutting, more careful setup and more inspection. One bore at ±0.01 mm can cost several times more to make than the same bore at ±0.05 mm (typical).
Q3: Should I always ask for a material certificate?
A: Only if your industry or customer requires traceability. For prototypes and simple parts it is often unnecessary cost. State whether you need it when you request the quote.
Q4: How much does quantity change the unit price?
A: Setup time is roughly fixed per job, so it spreads across the batch. One piece carries all of it; a hundred pieces share it. Always compare quotes at the same quantity.
Q5: What if a shop will not break down its quote?
A: Ask once, in writing, for the five lines. If it still will not break the price down, you cannot verify what you are buying — that is a reason to be cautious, not a reason to assume the worst.
Send your drawing for a quote and a manufacturability check — we reply within one working day. Request a quote